Project Description
The project was authorised in the summer of 2012 and entered the phase of construction in the summer of 2012. The company concluded a contract with LAGIE SA for the project, in January 2012 with a price Feed in Tariff: 0.404 €/kWh. The station was connected to the network of DEDDIE SA in September 2012 and thereafter works seamlessly.
Position: | “Alonia or Plakes or Manolias” of the Municipal Unity Lousika, Municipality of Western Achaia, Prefecture of Achaia |
Power: | 80,9kWp |
Ownership: | Energy Trading SA |
Project Phase: | In Operation |
Technology: | Photovoltaic |
Equipment: | Panel: Conergy Power Plus 235P, Inverter: 4x Conergy IPG15T & 1x Conergy IPG11T, Bases: Aluminum by Metalloymin SA |