Project Description
Projects History: The company is planning a 250kW project in the location. The company received the connection terms from DEDDIE SA, in may 2013. The project for the time being, is at the stage of Environmental licensing after the submission of an MPE by the company, in September 2013. At the same time, the company is concluding Raw material supply contracts, with local providers.
Position: | “Vagia” of the Municipal Unity Agios Loukas, Municipality of Aliveri – Kymi, Prefecture of Evia |
Power: | 250kWp |
Ownership: | Energy Trading SA |
Project Phase: | Under Authorization |
Technology: | Gasification |
Equipment: | |
Production Data: | |
Study Information: | |
Raw Material: | The unit will use feedstock of olive husk, (oil mill’s waste), which will be supplied by the 10 local oil Mills and reed strains, which will be supplied from the nearby lake of Dystos. |