Project Description
The project was authorised in the summer of 2012 and entered the phase of construction in the summer of 2012. The company concluded a contract with LAGIE SA for the project in January 2012, with a price Feed in Tariff: 0.404 €/kWh. The station was connected to the network of DEDDIE SA in February 2012 and thereafter works seamlessly.
| Position: |
“Paliodragatsa” of the Municipal Unity Prosilio, Municipality of Amfissa, Prefecture of Fokida |
| Power: |
99,875kWp |
| Ownership: |
Energy Trading SA |
| Project Phase: |
In operation |
| Technology: |
Photovoltaic |
| Equipment: |
Panel: Conergy ECOPRO 235P, 8 x Kaco Powador 14.0 TL, 8 x Tracking System Technometalliki MEPE |