Project Description
The project was authorised in the summer of 2011 and entered the phase of construction in April 2012. The company concluded a contract with LAGIE SA for the project in January 2012, with a price Feed in Tariff: 429,46 €/MWh. The station was connected to the network of DEDDIE SA in June 2012 and thereafter works seamlessly.
| Position: |
“Rafi” of the Municipal Unity Davlia, Municipality of Livadia, Prefecture of Viotia. |
| Power: |
99,875 kWp |
| Ownership: |
Econoisis ΑΒΕΤΕ |
| Project Phase: |
In operation |
| Technology: |
Photovoltaic |
| Equipment: |
Panel: Conergy PowerPlus 235P, Inverter: 8 x Kaco Powador 14.0 TL, 8 x Tracking System by Technometalliki MEPE |
| Production Data: |
289.000 kWh until October of 2013 |